100 MWe awarded in Catalonia wind power tender
Deenma obtains the VII priority development area of the Catalan wind power tender for its client FCC Energía. The to-be-installed power reaches 100 MWe (November 2010)
Deenma obtains the VII priority development area of the Catalan wind power tender for its client FCC Energía. The to-be-installed power reaches 100 MWe (November 2010)